Unit | Type | Thermal power |
Electric power |
Status (3/2011) |
Start- up |
Shut- down |
Accidents assessed |
Results | |
1 | PWR Gidropress 4-loop VVER 1000/320 | 3000 MW | 1000 MW | in operation | 1984 | exp. 2030 | SGTR | contamination and dose |
risk per NPP unit |
2 | PWR Gidropress 4-loop VVER 1000/320 | 3000 MW | 1000 MW | in operation | 1985 | exp. 2031 | SGTR | contamination and dose |
risk per NPP unit |
3 | PWR Gidropress 4-loop VVER 1000/320 | 3000 MW | 1000 MW | in operation | 1986 | exp. 2032 | SGTR | contamination and dose |
risk per NPP unit |
4 | PWR Gidropress 4-loop VVER 1000/320 | 3000 MW | 1000 MW | in operation | 1987 | exp. 2033 | SGTR | contamination and dose |
risk per NPP unit |
5 | PWR Gidropress 4-loop VVER 1000/320 | 3000 MW | 1000 MW | in operation | 1989 | exp. 2034 | SGTR | contamination and dose |
risk per NPP unit |
6 | PWR Gidropress 4-loop VVER 1000/320 | 3000 MW | 1000 MW | in operation | 1995 | exp. 2041 | SGTR | contamination and dose |
risk per NPP unit |