Unit | Type | Thermal power |
Electric power |
Status (3/2011) |
Start- up |
Shut- down |
Accidents assessed |
Results | |
1 | PWR Framatome 3-loop CP0-Type | 2873 MW | 1009 MW | in operation | 1975 | exp. 2025 | ISLOCA | contamination and dose |
risk per NPP unit |
2 | PWR Westinghouse 3-loop | 3064 MW | 1055 MW | in operation | 1982 | exp. 2022 | ISLOCA | contamination and dose |
risk per NPP unit |
3 | PWR Westinghouse 3-loop | 3000 MW | 1065 MW | in operation | 1985 | exp. 2025 | ISLOCA | contamination and dose |
risk per NPP unit |