| Unit | Type | Thermal power | Electric power | Status (3/2011) | Start- up | Shut- down | Accidents assessed | Results | |
| 1 | BWR ABB-Atom BWR 75 | 2500 MW | 890 MW | in operation | 1978 | exp. 2039 | RPVF_ECF | contamination and dose | risk per NPP unit | 
| 2 | BWR ABB-Atom BWR 75 | 2500 MW | 890 MW | in operation | 1980 | exp. 2042 | RPVF_ECF | contamination and dose | risk per NPP unit | 
| 3 | PWR AREVA EPR | 4300 MW | 1720 MW | planned or under construction | exp. 2013 | exp. 2073 | SA_ECF | contamination and dose | risk per NPP unit |