| Unit | Type | Thermal power | Electric power | Status (3/2011) | Start- up | Shut- down | Accidents assessed | Results | |
| 3 | PWR Gidropress 6-loop VVER 440/179 | 1375 MW | 417 MW | in operation | 1971 | exp. 2016 | SA_ECF | contamination and dose | risk per NPP unit | 
| 4 | PWR Gidropress 6-loop VVER 440/179 | 1375 MW | 417 MW | in operation | 1972 | exp. 2017 | SA_ECF | contamination and dose | risk per NPP unit | 
| 5 | PWR Gidropress 4-loop VVER 1000/187 | 3200 MW | 1000 MW | in operation | 1980 | exp. 2035 | Bypass | contamination and dose | risk per NPP unit | 
| II-1 | PWR Gidropress 4-loop VVER 1200/392 M | 3200 MW | 1160 MW | planned or under construction | exp. 2012 | exp. 2072 | SGTR | contamination and dose | risk per NPP unit | 
| II-2 | PWR Gidropress 4-loop VVER 1200/392 M | 3200 MW | 1160 MW | planned or under construction | exp. 2013 | exp. 2073 | SGTR | contamination and dose | risk per NPP unit |