Unit | Type | Thermal power |
Electric power |
Status (3/2011) |
Start- up |
Shut- down |
Accidents assessed |
Results | |
3 | PWR Gidropress 6-loop VVER 440/179 | 1375 MW | 417 MW | in operation | 1971 | exp. 2016 | SA_ECF | contamination and dose |
risk per NPP unit |
4 | PWR Gidropress 6-loop VVER 440/179 | 1375 MW | 417 MW | in operation | 1972 | exp. 2017 | SA_ECF | contamination and dose |
risk per NPP unit |
5 | PWR Gidropress 4-loop VVER 1000/187 | 3200 MW | 1000 MW | in operation | 1980 | exp. 2035 | Bypass | contamination and dose |
risk per NPP unit |
II-1 | PWR Gidropress 4-loop VVER 1200/392 M | 3200 MW | 1160 MW | planned or under construction | exp. 2012 | exp. 2072 | SGTR | contamination and dose |
risk per NPP unit |
II-2 | PWR Gidropress 4-loop VVER 1200/392 M | 3200 MW | 1160 MW | planned or under construction | exp. 2013 | exp. 2073 | SGTR | contamination and dose |
risk per NPP unit |