Unit | Type | Thermal power |
Electric power |
Status (3/2011) |
Start- up |
Shut- down |
Accidents assessed |
Results | |
1 | PWR Gidropress 6-loop VVER 440/213 | 1375 MW | 470 MW | in operation | 1989 | exp. 2028 | SA_ECF | contamination and dose |
risk per NPP unit |
2 | PWR Gidropress 6-loop VVER 440/213 | 1375 MW | 470 MW | in operation | 1999 | exp. 2039 | SA_ECF | contamination and dose |
risk per NPP unit |
3 | PWR Gidropress 6-loop VVER 440/213 | 1375 MW | 440 MW | planned or under construction | exp. 2012 | exp. 2062 | SA_ECF | contamination and dose |
risk per NPP unit |
4 | PWR Gidropress 6-loop VVER 440/213 | 1375 MW | 440 MW | planned or under construction | exp. 2013 | exp. 2063 | SA_ECF | contamination and dose |
risk per NPP unit |