Unit | Type | Thermal power |
Electric power |
Status (3/2011) |
Start- up |
Shut- down |
Accidents assessed |
Results | |
1 | PWR KWU 4-loop (Pre Convoi) | 3765 MW | 1345 MW | in operation | 1981 | exp. 2028 | ISLOCA | contamination and dose |
risk per NPP unit |