Unit | Type | Thermal power |
Electric power |
Status (3/2011) |
Start- up |
Shut- down |
Accidents assessed |
Results | |
1 | PWR Framatome 4-loop P4-Type | 3817 MW | 1382 MW | in operation | 1985 | exp. 2046 | ISLOCA | contamination and dose |
risk per NPP unit |
2 | PWR Framatome 4-loop P4-Type | 3817 MW | 1382 MW | in operation | 1986 | exp. 2047 | ISLOCA | contamination and dose |
risk per NPP unit |
3 | PWR AREVA EPR | 4300 MW | 1650 MW | planned or under construction | exp. 2016 | exp. 2072 | SA_ECF | contamination and dose |
risk per NPP unit |