Unit | Type | Thermal power |
Electric power |
Status (3/2011) |
Start- up |
Shut- down |
Accidents assessed |
Results | |
1 | PWR Framatome 3-loop CP0-Type | 2660 MW | 920 MW | in operation | 1977 | exp. 2037 | ISLOCA | contamination and dose |
risk per NPP unit |
2 | PWR Framatome 3-loop CP0-Type | 2660 MW | 920 MW | in operation | 1977 | exp. 2037 | ISLOCA | contamination and dose |
risk per NPP unit |