Unit | Type | Thermal power |
Electric power |
Status (3/2011) |
Start- up |
Shut- down |
Accidents assessed |
Results | |
1 | PWR KWU 4-loop (Convoi) | 3850 MW | 1400 MW | in operation | 1988 | exp. 2037 | ISLOCA | contamination and dose |
risk per NPP unit |