Unit | Type | Thermal power |
Electric power |
Status (3/2011) |
Start- up |
Shut- down |
Accidents assessed |
Results | |
1 | PWR Framatome 3-loop CP2-Type | 2785 MW | 956 MW | in operation | 1983 | exp. 2044 | ISLOCA | contamination and dose |
risk per NPP unit |
2 | PWR Framatome 3-loop CP2-Type | 2785 MW | 956 MW | in operation | 1984 | exp. 2045 | ISLOCA | contamination and dose |
risk per NPP unit |
3 | PWR Framatome 3-loop CP2-Type | 2785 MW | 956 MW | in operation | 1984 | exp. 2044 | ISLOCA | contamination and dose |
risk per NPP unit |
4 | PWR Framatome 3-loop CP2-Type | 2785 MW | 956 MW | in operation | 1984 | exp. 2045 | ISLOCA | contamination and dose |
risk per NPP unit |