| Unit | Type | Thermal power | Electric power | Status (3/2011) | Start- up | Shut- down | Accidents assessed | Results | |
| B1 | PWR Framatome 4-loop N4-Type | 4270 MW | 1560 MW | in operation | 1996 | exp. 2056 | ISLOCA | contamination and dose | risk per NPP unit | 
| B2 | PWR Framatome 4-loop N4-Type | 4270 MW | 1560 MW | in operation | 1997 | exp. 2057 | ISLOCA | contamination and dose | risk per NPP unit |