Unit | Type | Thermal power |
Electric power |
Status (3/2011) |
Start- up |
Shut- down |
Accidents assessed |
Results | |
B1 | PWR Framatome 3-loop CP2-Type | 2785 MW | 954 MW | in operation | 1982 | exp. 2044 | ISLOCA | contamination and dose |
risk per NPP unit |
B2 | PWR Framatome 3-loop CP2-Type | 2785 MW | 954 MW | in operation | 1983 | exp. 2044 | ISLOCA | contamination and dose |
risk per NPP unit |
B3 | PWR Framatome 3-loop CP2-Type | 2905 MW | 954 MW | in operation | 1986 | exp. 2047 | ISLOCA | contamination and dose |
risk per NPP unit |
B4 | PWR Framatome 3-loop CP2-Type | 2905 MW | 954 MW | in operation | 1987 | exp. 2048 | ISLOCA | contamination and dose |
risk per NPP unit |