| Unit | Type | Thermal power | Electric power | Status (3/2011) | Start- up | Shut- down | Accidents assessed | Results | |
| B1 | PWR Framatome 3-loop CP2-Type | 2785 MW | 954 MW | in operation | 1982 | exp. 2044 | ISLOCA | contamination and dose | risk per NPP unit | 
| B2 | PWR Framatome 3-loop CP2-Type | 2785 MW | 954 MW | in operation | 1983 | exp. 2044 | ISLOCA | contamination and dose | risk per NPP unit | 
| B3 | PWR Framatome 3-loop CP2-Type | 2905 MW | 954 MW | in operation | 1986 | exp. 2047 | ISLOCA | contamination and dose | risk per NPP unit | 