| Unit | Type | Thermal power | Electric power | Status (3/2011) | Start- up | Shut- down | Accidents assessed | Results | |
| 1 | PWR Framatome 4-loop P4-Type | 3817 MW | 1362 MW | in operation | 1987 | exp. 2046 | ISLOCA | contamination and dose | risk per NPP unit | 
| 2 | PWR Framatome 4-loop P4-Type | 3817 MW | 1362 MW | in operation | 1988 | exp. 2047 | ISLOCA | contamination and dose | risk per NPP unit | 
| 3 | PWR Framatome 4-loop P4-Type | 3817 MW | 1362 MW | in operation | 1990 | exp. 2050 | ISLOCA | contamination and dose | risk per NPP unit | 
| 4 | PWR Framatome 4-loop P4-Type | 3817 MW | 1362 MW | in operation | 1991 | exp. 2051 | ISLOCA | contamination and dose | risk per NPP unit |