Unit | Type | Thermal power |
Electric power |
Status (3/2011) |
Start- up |
Shut- down |
Accidents assessed |
Results | |
2 | PWR Framatome 3-loop CP0-Type | 2785 MW | 945 MW | in operation | 1978 | exp. 2039 | ISLOCA | contamination and dose |
risk per NPP unit |
3 | PWR Framatome 3-loop CP0-Type | 2785 MW | 945 MW | in operation | 1978 | exp. 2039 | ISLOCA | contamination and dose |
risk per NPP unit |
4 | PWR Framatome 3-loop CP0-Type | 2785 MW | 917 MW | in operation | 1979 | exp. 2039 | ISLOCA | contamination and dose |
risk per NPP unit |
5 | PWR Framatome 3-loop CP0-Type | 2785 MW | 917 MW | in operation | 1979 | exp. 2040 | ISLOCA | contamination and dose |
risk per NPP unit |