| Unit | Type | Thermal power | Electric power | Status (3/2011) | Start- up | Shut- down | Accidents assessed | Results | |
| 1 | PWR KWU 4-loop | 3517 MW | 1225 MW | permanent shutdown | 1974 | 2011 | ISLOCA | contamination and dose | risk per NPP unit | 
| 2 | PWR KWU 4-loop | 3733 MW | 1300 MW | permanent shutdown | 1976 | 2011 | ISLOCA | contamination and dose | risk per NPP unit |