Unit | Type | Thermal power |
Electric power |
Status (3/2011) |
Start- up |
Shut- down |
Accidents assessed |
Results | |
1 | PWR Gidropress 4-loop VVER 1000/446 | 3100 MW | 1060 MW | planned or under construction | exp. 2017 | exp. 2077 | SGTR | contamination and dose |
risk per NPP unit |
2 | PWR Gidropress 4-loop VVER 1000/446 | 3100 MW | 1060 MW | planned or under construction | exp. 2018 | exp. 2078 | SGTR | contamination and dose |
risk per NPP unit |